1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Nadya [2.5K]
3 years ago
12

Solve for b –1 + 2b − 9 = 10b − 10

Mathematics
1 answer:
Over [174]3 years ago
6 0

Answer:

The answer is B= 0

I'm positive

You might be interested in
Rob and his two friends were digging holes to plant some new trees. The holes need to be at least 3 feet deep. So far robs hole
Greeley [361]

Rewrite all the numbers as decimals:

14/5 = 2.8

2.6 is already a decimal

2 1/8 = 2.125

2.8 is the largest number so rob is closest to being finished.

7 0
3 years ago
Chanita wants to swim the 21-mile English Channel in 48 hours. On the first day she swam 9 miles and then was picked up by a fer
sesenic [268]

Answer:the minimum rate is 1 mile per hour.

Step-by-step explanation:

Chanita wants to swim the 21-mile English Channel in 48 hours. Total number of miles that she covered on the first day is 9 miles. Total distance left for her to cover would be

21 - 9 =12 miles.

The next day, she has 12 hours of daylight to complete the remaining distance. Let x represent the minimum rate she has to swim on the second day to complete the distance.

Speed = distance/time

Therefore,

x ≥ 12/12

x ≥ 1

8 0
3 years ago
What is the difference of the two expressions?<br> (<br> 3<br> 7<br> + 9) − (<br> 2<br> 7<br> − 3)
ivann1987 [24]

Answer:

22

Step-by-step explanation:

Simplify the expression

8 0
3 years ago
A sprinkler system is being installed in a newly renovated building on campus. The average activation time is supposed to be at
melomori [17]

Answer:

A) t = 1.73

B) p-value =  0.0558

C) Data is not statistically significant because the p-value of 0.0558 is more than the significance value of 0.05

D) The decision means that the design specifications are not met.

E) Type II error

Step-by-step explanation:

The hypotheses are:

H₀: μ = 20

H₁: μ > 20

A) Formula for the test statistic is;

t = (x' - μ)/(s/√n)

Now, we are given;

x' = 21.5

μ = 20

s = 3

n = 12

Thus;

t = (21.5 - 20)/(3/√12)

t = 1.73

B) we have our t-value as 1.73

Now, Degree of freedom(DF) = n - 1

So,DF = 12 - 1 = 11

Using significance level of α = 0.05, t-value = 1.73 and DF = 11, one tailed hypothesis, from online P-value calculator attached, we have;

p-value =  0.0558

C) Data is not statistically significant because the p-value of 0.0558 is more than the significance value of 0.05

D) We will not reject the null hypothesis. The decision means that the design specifications are not met.

E) If the true average activation time of the sprinkler system is, in fact, equal to 20 seconds, then the null hypothesis is false.

Since we did not reject the null hypothesis even though it is false, the error that was committed was therefore a type II error.

4 0
3 years ago
A company had an 8% increase in profits in July. If the July profits were
vovikov84 [41]

Answer:

A- $55k

Step-by-step explanation:

common sense if there was in increase by only 8% that the only logial answer that would be the A- : $4444 when you multiply 8% of 55,555

5 0
3 years ago
Read 2 more answers
Other questions:
  • Which of the following sets is equal to {1,2,3...}?
    5·1 answer
  • Dominic, Ralf and Peter have just eaten a HUGE Christmas meal. Dominic now weighs half as much as Ralph, and Peter weighs three
    8·1 answer
  • Berkley has 10 pieces of ribbon that are 2 yards each. She uses 8 pieces that are each 3 feet long. How many feet of ribbon does
    15·2 answers
  • E = mv^2<br><br> Work out the value of E when m = 3 and v = 10
    13·2 answers
  • 1. what is the x of "5x - 4 = 3x + 8"
    13·1 answer
  • There are 60 minutes in an hour. What are the total number of minutes in 6 hours and 15 mins
    13·2 answers
  • Write a linear function f with the values f(2)=4 and f(-7)=9
    6·1 answer
  • A police car is approaching a right-angled intersection from the north at 35 mph, and a speeding car is heading east at 30 mph.
    13·2 answers
  • I will give brainlest
    11·2 answers
  • Given PQ = 24
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!