1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
leva [86]
2 years ago
9

4600 X 1.04 to the power of 7?????

Mathematics
2 answers:
kakasveta [241]2 years ago
7 0

Answer:

4784 to the power of 7

Step-by-step explanation:

i'm not sure if i interpreted what you wrote correctly, but if its ((4600*1.04)to the power of 7), then my answer would be correct.

if it was 4600*1.04 (where 1.04 would be to the power of 7), then the answer would be about 6053.28618, or 4600*26 to the power of 7/ 25 to the power of 7

BaLLatris [955]2 years ago
6 0

Answer:

6053.28618448

no is the power of 6

You might be interested in
Match the measures with the correct type of measurement:
r-ruslan [8.4K]

Answer:

72 m = Perimeter

125 mm^3 = Volume

50 cm^2 = Surface Area

7 0
2 years ago
Read 2 more answers
Who won the race between the two balls of string
motikmotik
The higher one I think
7 0
2 years ago
Please Answer??? The binomial expansion of (2x-y)^3 is
Marina86 [1]
Your answer is B. 

I hope this helped :-)

Could I have brainly-ist?
3 0
3 years ago
Read 2 more answers
Complete point slope
krek1111 [17]

Answer:

i think its 8

Step-by-step explanation:

8 0
2 years ago
The following is a linear programming formulation of a labor planning problem. There are four overlapping shifts, and management
dexar [7]

Answer:

d. 15

Step-by-step explanation:

Putting the values in the shift 2 function

X1 + X2 ≥ 15

where x1=  13, and x2=2

13+12≥ 15

15≥ 15

At least 15 workers must be assigned to the shift 2.

The LP model questions require that the constraints are satisfied.

The constraint for the shift 2 is that the  number of workers must be equal or greater than 15

This can be solved using other constraint functions e.g

Putting  X4= 0 in

X1 + X4 ≥ 12

gives

X1 ≥ 12

Now Putting the value X1 ≥ 12  in shift 2 constraint

X1 + X2 ≥ 15

12+ 2≥ 15

14 ≥ 15

this does not satisfy the condition so this is wrong.

Now from

X2 + X3 ≥ 16

Putting X3= 14

X2 + 14 ≥ 16

gives

X2  ≥ 2

Putting these in the shift 2

X1 + X2 ≥ 15

13+2 ≥ 15

15 ≥ 15

Which gives the same result as above.

6 0
3 years ago
Other questions:
  • David has 20 coins he gave some coins to Peter David had 8 coins left. How many coins did David give to Peter?
    10·1 answer
  • 5x+3y=3 And 3x+5y=-25
    8·1 answer
  • Find the area of a regular pentagon with side = 12
    9·2 answers
  • Write equations for the vertical and horizontal lines passing through the point (8,-9)
    8·1 answer
  • Is (5, 7) a solution to the equation y = x + 2?
    5·2 answers
  • What is the prime factorization for 160 using exponents?
    15·2 answers
  • Solve the equation
    10·2 answers
  • Help help help help!!!!!
    5·2 answers
  • How can you tell if a linear system of equations has an infinite number of solutions?
    5·1 answer
  • Please can someone answer this for me?
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!