Let's look at work rates per minute.
Together they can paint the wall in x minutes.
Working together, in 1 minute, they do 1/x of the job.
The student who paints the wall in 16 minutes does 1/16 of the job in 1 minute.
The student who paints the wall in 24 minutes does 1/24 of the job in 1 minute.
Together, they do 1/16 + 1/24 of the job in 1 minute, but from above, we see that together, they do 1/x of the job in 1 minute, so 1/16 + 1/24 must equal 1/x. That gives us our equation.
1/16 + 1/24 = 1/x
1/16 * 3/3 + 1/24 * 2/2 = 1/x
3/48 + 2/48 = 1/x
5/48 = 1/x
x = 48/5 = 9.6
Answer: It takes them 9.6 minutes, or about 10 minutes to do the job together.
Answer:
Hmmmm, very tricky question but I'll figure it out and type it in the comments
Lemme think bout it....no
5) The slope is: 6
6) Answer: y=-1/2x+3
7) Answer: The slope is: -8, the y intercept is: 6
8) Answer: y=8x+30
Have a good day and a hug :D づ◡﹏◡)づ
Answer:
31 + 4y
Step-by-step explanation:
4(6+y)+7
Expand the brackets.
24+4y+7
Rearrange.
4y + 24 + 7
Add the like terms.
4y + 31