I'm assuming 43 is actually 4/3
see what number the previous term must be multiplied by to get the next term
4 *something = 12, 12*something=36
common ratio is 3
The first thing we do in these cases is to define the variables.
We have then:
w = represent the number of acres of wheat
c = represent the number of acres of corn
We write now the inequalities based is:
"Jess will plant up to 27 acres on her farm with wheat and corn"
w + c <= 27
"More than 5 acres will be planted with wheat"
w> 5
Answer:
two inequalities that represent this situation are:
w + c <= 27
w> 5
Answer:
2
Step-by-step explanation:
The range of class A is 5-0 = 5
The range of class B is 3-0 = 3
the difference between 3 and 5 is 2.
The absolute function will be f(x) = | x - 5 | - 4.
<h3 /><h3>What is an absolute function?</h3>
The absolute function is also known as the mode function. The value of the absolute function is always positive.
The absolute function is given as
f(x) = | x - h | + k
Where h,k is the vertex of the absolute function.
f(x) = | x - 5 | - 4
Therefore the absolute function will be f(x) = | x - 5 | - 4.
More about the absolute function link is given below.
brainly.com/question/10664936
#SPJ1
Answer:
Image 1
Step-by-step explanation:
To answer this question, we need to know how to use a box plot.
I've attached an image that demonstrates this well and can teach you what each part of the box plot means.
Specifically, the 2 farthest dots at the end are the minimum and maximum. The two sides where the box starts are the lower and upper quartiles. Finally, the line in the middle of the box is the median.
With this, we can analyze each box plot and determine which one is correct.
<em><u>Box Plot 1: </u></em><em>Everything is plotted correctly- Maximum and minimum plotted correctly, median plotted correctly, upper and lower quartile plotted correctly.</em>
<u>Box Plot 2:</u> Everything plotted correctly EXCEPT maximum of 48 is represented at 46.
<u>Box Plot 3:</u> Everything plotted correctly EXCEPT the upper quartile of 45 is at 39.
<u>Box Plot 4:</u> Upper quartile represented at 39 and maximum represented at 46 are both incorrect.