Answer:
Step-by-step explanation:
Muy difícil pa
Answer:
$3.42
Step-by-step explanation:
Meters of material required = 1.2 meters
Cost per meter of material = $0.85
Direct labor hours = 0.1
Cost of direct labor per hour = $15
Overhead rate = $9 per direct labor hour
Standard cost per unit of product :
(Direct material cost per unit + direct labor cost per unit + overhead cost per unit)
Direct material cost per unit :
Material needed × cost per meter = (1.2 × $0.85) = $1.02
Direct labor cost per unit :
Direct labor hour × cost per hour = ( 0.1 × $15) = $1.5
Overhead cost:
0.1 * $9 = $0.9
Standard cost :
($1.02 + $1.5 + $0.9) = $3.42
If Amazon gets 5% of each sale they make, find 5% of the $80 sale. You have to convert 5% to a decimal, which is 0.05. → 80 * 0.05 is $4 which means that if they sell something for $80, Amazon will recieve $4.
We must remember that 50 x 2 = 100. Multiplying numbers by 100 would be easier since all we have to do is add two zeros after. For example, 62 x100 = 6200.
Since we multiplied a number by 2, we must divide it by 2 after getting the product. To make this more clearer, for 12 x 50, for example, we have
12 x 50 = (12 x 100)/2 = 1200/2 = 600
Thus, the answer is C<span>.</span>
Answer:
8
Step-by-step explanation:
Use the pythagorean theorem. The hypotenuse (c) is 10, and one of the sides, let's say (b), is 6. Therefore, we need to solve for a and plug and chug. Let's do that:


Now let's plug in what we know:

Therefore, a = x = 8