<span>The cost of each mile is $2.50.
If you simplify the expression given you will get the following.
y = 3.75 + 2.50(x - 3)
y = 3.75 + 2.50x - 7.50
y = 2.50x - 3.75.
Knowing that x is the number of miles and 2.50 is the number being multiplied by, we know that the cost per mile is 2.50. </span>
Answer:
4 minus a number times three
ok so the answer is A well i think it is at least this one is hard and im sorry if i got it wrong bc i did the math in my head.lol
A triangle is
A polygon with
3 angles(x2)
3 sides
Answer:
Hence the 3.28 %or 2/61 of total work will be done .
Step-by-step explanation:
Given:
The pecan crops are harvested for friday and saturday (2days)
To find :
What fraction these 2 days corresponds to the harvesting days?
Solution;
The pecan crops are growing in America in state of Georgia
and consider that in months of October and November pecan crop becomes mature .
Hence the harvesting period is of 2 months considerably .
The month of October and November days are 31 and 30 .
Hence the Total days of harvesting are 61 days.
In these days total Pecan crops will be harvested.(100% work in 61 days)
Now the farmer harvest for 2 days only .
Required fraction=2/61
=0.0327869
=3.28%
Depending upon the crop field and planting answer will vary
But 3.28 % of total work will be done in 2 days on harvesting