There you go here’s the graph
Total cost job=
Retail price of parts+labor cost+manufacturing overhead
Total cost job 82
Retail price of parts 0
Labor cost=7.5×6.5=48.75
Manufacturing overhead ?
82=0+48.75+?
?=82−48.75
?=33.25
Manufacturing overhead is 33.25
Now find manufacturing overhead rate from the cost of labor
33.25÷48.75=0.682×100=68.2%
The answer 68.2%
Answer:
low yup yup yup
Step-by-step explanation:
yeah it's a low
Answer:
122.67 or round it to 123
Step-by-step explanation:
i used the butterfly method.
92/75 = x/100.
i multiplied 92*100=9200
then i divided it with 75.
9200/75=x
so the answer is
x=122 or 123
Yes it does include the test point (0, 0)
<h3>
Find y-intercept:</h3>
<h3>
Find x-intercept:</h3>
<u>switch sides</u>
<u>Multiply both sides by -1 reverses the inequality</u>
Thus, the following (0, 0) comes under the following x > -5/3 and y > -5