Answer:
The numbers of measure of music played are 1 and 7
Step-by-step explanation:
Given

Required
Solve for x when s = 80
Substitute 80 for x

Subtract 50 from both sides


Divide through by 10


Reorder

This can be split into
or 
Solve for x
or 
or 
Hence:
<em>The numbers of measure of music played are 1 and 7</em>
Answer:
a.P<x<9.85 orx>10.15)=0.3174, Total defects=317.4
b.p=0.0026,total defects=2.6
c.Less of the items produced will be classified as defects.
Step-by-step explanation:
a.The standard score,z, is esentially x reduced by process mean then divided my process standard deviation.

Total defects=Production*Probability
=0.3174*1000

b. 
therefore:-

Defects=Probability*Production
=0.0026*1000
=2.6
c.Reducing process variation results in a significant reduction in the number of unit defects.
Answer:
D
Step-by-step explanation:
Answer:
Step-by-step explanation:
y is 15.49
Formula is b = √c^2-a^2
You could use sine [ opposite/hypotenuse ],
Cosine [adjacent/hypotenuse]
or Tangent [ opposite/adjacent ]
to find theta
Theta is 75.522
Answer:
13/20
Step-by-step explanation:
This is actually pretty simple. I had trouble with this for the longest time but it makes sense to me now. A number that is a percent is equal to that number over 100.
65%=65/100
Then all you have to do is simplify! (yaaay)
65/100=<u>13/20</u>
<u></u>
If you need anymore help with this or anything else just let me know!