1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
quester [9]
3 years ago
5

A job can be done by 30 men in 15 days. How long would it take 10 men to do the same job?​

Mathematics
1 answer:
Vladimir79 [104]3 years ago
3 0

Answer:

5 days

Step-by-step explanation:

This questions involves ratios, the job with 30 men can be done in 15 days, so the ratio from amount of men to amount of days the job will take to complete, it is 30:15. If we had 10 men instead of 30, 10 is one-third of 30, so you have to divide by 3 on each side of the ratio to get your answer.

If we do that we get the ratio 10:5.

Meaning that the 5 is the amount of days needed to be taken in order the complete the job.

Hope this helps!

You might be interested in
A machine, when working properly, produces 5% or less defective items. Whenever the machine produces significantly greater than
vovikov84 [41]

Answer:

The pvalue of the test is 0.0007 < 0.01, which means that we reject the null hypothesis and accept the alternate hypothesis that the percentage of defective items produced by this machine is greater than 5%.

Step-by-step explanation:

A machine, when working properly, produces 5% or less defective items.

This means that the null hypothesis is:

H_0: p \leq 0.05

Test if the percentage of defective items produced by this machine is greater than 5%.

This means that the alternate hypothesis is:

H_a: p > 0.05

The test statistic is:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

In which X is the sample mean, \mu is the value tested at the null hypothesis, \sigma is the standard deviation and n is the size of the sample.

0.05 is tested at the null hypothesis:

This means that \mu = 0.05, \sigma = \sqrt{0.05*0.95}

A random sample of 300 items taken from the production line contained 27 defective items.

This means that n = 300, X = \frac{27}{300} = 0.09

Value of the test statistic:

z = \frac{X - \mu}{\frac{\sigma}{\sqrt{n}}}

z = \frac{0.09 - 0.05}{\frac{\sqrt{0.05*0.95}}{\sqrt{300}}}

z = 3.18

Pvalue of the test:

Testing if the mean is greater than a value, which means that the pvalue of the test is 1 subtracted by the pvalue of Z = 3.18, which is the probability of a finding a sample proportion of 0.09 or higher.

Looking at the Z-table, Z = 3.18 has a pvalue of 0.9993

1 - 0.9993 = 0.0007

The pvalue of the test is 0.0007 < 0.01, which means that we reject the null hypothesis and accept the alternate hypothesis that the percentage of defective items produced by this machine is greater than 5%.

5 0
3 years ago
Multiply the numbers and simplifty the answer 3x1 3/4
melamori03 [73]
2.25 is the answer you take 3 times 3/4 and you get 2.25
3 0
4 years ago
Name each quadrilateral for which the statement is always true.
sertanlavr [38]

Answer:

rhombus

Step-by-step explanation:

Rhombus has that equiangular and is equilateral but I'm not entirely sure about this...

3 0
3 years ago
A square field has a perimeter of 44 meters.Find the length of one side of the field
riadik2000 [5.3K]
11 Meters because squares have 4 even sides. So you divide 44 by 4 and you get 11. This means every side is 11 meters long.
6 0
3 years ago
Write a pair of equivalent expressions using distributive property
bulgar [2K]
The distributive property "distributes" a number through all numbers/terms in a set of parentheses by multiplication.


EXAMPLES
Equivalent expressions are the first and last steps. The middle step just shows the work.

5(2 + 3x)= (5*2) + (5*3x)= 7 + 15x

4(2x + 4y)= (4*2x) + (4*4y)= 8x + 16y

10(4x + 5)= (10*4x) + (10*5)= 40x + 50


ANSWER:
Only one pair below is needed for your answer.

5(2 + 3x)= 7 + 15x

4(2x + 4y)= 8x + 16y

10(4x + 5)= 40x + 50


Hope this helps! :)

7 0
3 years ago
Other questions:
  • It takes Prakash 2 1/2 hours to paint a medium sized room. If he can work 50 minutes each day, how many days will it take to com
    12·1 answer
  • The zoo uses 10 pounds of apples each day.how many pounds of apples should be on the weekly grocery list
    9·1 answer
  • Please help me I can’t figure them out
    13·1 answer
  • Boris is taking a quiz for an online class. For the quiz, the system randomly assigns 2 high-difficulty questions, 7 moderate-di
    10·1 answer
  • James wants to send two gifts by mail. One package weighs 2 3/4 pounds. The other package weighs 1 3/4. Want is the total weight
    7·1 answer
  • At the ski shack, customers can rent,skis, snowboards, boots, and poles by the day Mrs.Alvarez is renting skis and poles she has
    13·1 answer
  • Just need help with c, f, &amp; e <br><br> please provide a step by step explanation
    15·1 answer
  • Given that a x b = 70, work out the value of 3b/a
    5·1 answer
  • Subtract and simplify answer.
    14·2 answers
  • Convert the following numbers to engineering notation. Where applicable, solve and show answer in engineering notation. (8.2 × 1
    13·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!