Answer:
(1,2) and (1,5)
Step-by-step explanation:
Answer:
The total number of units produced is 6 .
Step-by-step explanation:
Given as :
The earning of worker at the factory = $ 12 per hour + $ 2.50 each unit per hour
The total earning of worker per hour = $ 27
Let The total number of unit produced = x
According to question
The wage worker earn per hour + earning × per unit produced that hour = Total earning of worker per hour
Or, $ 12 per hour + $ 2.50 each unit per hour × x = $ 27
Or, $ 2.50 each unit per hour × x = $ 27 - $ 12
Or, $ 2.50 each unit per hour × x = $ 15
∴ x =
Or, x = 6
Hence The total number of units produced is 6 . Answer
Answer:
hope this can help you (^^)
h(t) is the height of the diver in feet above the water
Now it asks about the time at which diver reaches the water
When diver reaches the water , the height of diver from water should be zero
So we plug h(t) =0
So
divide whole equation by -16
we can now factor the quadratic equation
So we get
(t+4)(t-3) =0
plug each factor equal to zero and solve for t
t+4 =0 and t-3 =0
So t=-4 and t=3
Now time cannot be negative , So t=3
So time = 3 seconds
It takes 3 seconds for the diver to reach the water
Answer:
<h3>Some Points about this Formula :- </h3>
- The formula given here is the definition of the derivative in calculus. The derivative measures the rate at which a quantity is changing.
- For example, we can think of velocity, or speed, as being the derivative of position - if you are walking at 3 miles (4.8 km) per hour, then every hour, you have changed your position by 3 miles.
<h3>To know the solution,Refer to the above attachment . </h3>