Answer:
Step-by-step explanation:
A company paid S /. 72 180 for a batch of 36 laptops and S /. 101 220 for a batch of 84 printers. What is the price per unit of each product?
For Laptops
72 180/36
= 2005
For Printers
101 220/84
= 1205
Answer:
a) The equation is:
Confidence Interval = Mean ± Z score × Standard deviation/√Number of samples
b) The 98% confidence interval = (5.62784, 6.37216)
Step-by-step explanation:
a. Write down the equation you should use to construct the confidence interval for the average number of days absent per term for all the children. (10 points)
Confidence Interval = Mean ± Z score × Standard deviation/√Number of samples
b. Determine a 98% confidence interval estimate for the average number of days absent per term for all the children. (10 points)
Confidence Interval = Mean ± Z score × Standard deviation/√Number of samples
Mean = 6 days
Standard deviation = 1.6 days
Number of samples = 100
Z score of 98% confidence interval = 2.326
Confidence interval = 6 ± 2.326 × 1.6/√100
= 6 ± 2.326 × 1.6/10
= 6 ± 0.37216
= 6 - 0.37216
= 5.62784
6 + 0.37216
= 6.37216
Therefore, the 98% confidence interval = (5.62784, 6.37216)
Answer:
3) Not equivalent
4) Equivalent
5) Equivalent
(Multiply by two for the last two questions)
Answer:
Equation : y = -0.5x − 8
Step-by-step explanation:
because i grabbed two points and plugged them in im not very good at explaining but im 99% sure thats right
A obtuse isosceles b obtuse scalene c acute isosceles