Answer:
468 sq. ft.
Step-by-step explanation:
A = 1/2 (a + b) (h)
= 1/2 (52) (18)
= 468 sq. ft.
ANSWER: .5X+1
X=NUMBER OF WEEKS AFTER THE FIRST WEEK.
I WOULD APPRECIATE A BRAINLIEST THANK YOU!
Positive 5/8 hope this helps :) uno reverse btw lol
The third option is the correct one
Answer:
95.15%
Step-by-step explanation:
We have that the mean (m) is equal to 20, the standard deviation (sd) 3
They ask us for P (x <25)
For this, the first thing is to calculate z, which is given by the following equation:
z = (x - m) / sd
We have all these values, replacing we have:
z = (25 - 20) / (3)
z = 1.66
With the normal distribution table (attached), we have that at that value, the probability is:
P (z <1.66) = 0.9515
Which means that the probability that it arrives before 25 minutes is 95.15%