Answer:
E.
Step-by-step explanation:
6^2=x^2+3^2
X^2=36-9
X=

Answer:
Expected return for site A = $9.6 million
Expected return for site B = $12.4 million
according to the above results the company should choose SITE B because it has higher Expected return
Step-by-step explanation:
Given;
For site A,
Site A net if successful = $30 million
Success probability = 0.4
Site A loss if not successful= -$4 million
Probability of not successful = 0.6
For site B.
Site B net if successful = $60 million
Success probability = 0.3
Site B loss if not successful= -$8 million
Probability of not successful = 0.7
To estimate the expected return on an event with outcomes X1 and X2 with probabilities p1 and p2
E = X1(p1) + X2(p2)
Substituting for site A
E = 30(0.4) - 4(0.6)
E = $9.6 million
Substituting for site B
E = 60(0.3) - 8(0.7)
E = $12.4 million
Therefore, according to the above results the company should choose site B because it has higher Expected return
A triangle is a triangle is two of the side lengths is greater than the third side.
A- (18+6= 24). (24>23). (13+6=19). (19>18). This is a triangle.
B- (13+22=35). (35>7). (22+7=29). (29>13). (13+7=20). (20<22) This is not a triangle.
C- (22+13=35). (35>8). (13+8=21). (21<8). This is not a triangle.
D- (6+18=24). (24>12). (12+6=18). (18=18) This is not a triangle.
The correct answer is A.
Answer:
the gcf is 9n i think
Step-by-step explanation:
i'm probably wrong tho