1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
olya-2409 [2.1K]
4 years ago
15

Ac=22 BC= x+41 and AB = x + 10 find x

Mathematics
1 answer:
Elenna [48]4 years ago
7 0
Draw the figure out and you will find that AB + BC = AC. Given this, put the equations together to form x+41+x+10=22. Solve to get x=-29/2
You might be interested in
Water is draining out of a 25 gallon cooler at a rate of 3 gallons a minute. After how many minutes is the cooler empty?
xz_007 [3.2K]
Divide 25 by 3 and you find 8.something. so if u need the gallon cooler to be empty the awnser would be 9 minutes
3 0
3 years ago
Read 2 more answers
You ran the race at a rate of 13 minutes per mile, what is the rate in feet per minute?
bazaltina [42]

Answer:

406.153846 or about 406 feet per minute

Step-by-step explanation:

Start by converting the 13 minutes per mile to feet per minute by turning the mile into 5,280 feet. So you run 5,280 feet in 13 minutes. Then you divide 5,280 by 13 so you get the amount of feet  per minute, hence about 406 feet per minute.

I didn't know if you needed an exact answer or to round so I gave you both :)

4 0
4 years ago
Is 23 and 25 co-primes
iren [92.7K]

Answer:

Yes

Step-by-step explanation:

Co primes are numbers whose only common factor is 1

Factors of 23 are : 1, 23

Factors of 25 are : 1, 5, 25

The only common factor is 1

Thus 23 and 25 are co prime

4 0
3 years ago
Read 2 more answers
The critical path for the project has an expected duration of 112 days, and a standard deviation of 5 days. The probability of f
leonid [27]
<h2>Answer with explanation:</h2>

Given : The critical path for the project has an expected duration of 112 days, and a standard deviation of 5 days.

i.e. \mu=112\ ;\ \sigma=5

We assume that this a normal distribution.

Let x be the random variable that represents the time duration to complete the project.

z-score : z=\dfrac{x-\mu}{\sigma}

For x= 115

z=\dfrac{115-112}{5}=0.6

P-value : P(z

Thus, the probability of finishing on time if the due date is 115 days is 0.726.

Also, for x= 120

z=\dfrac{120-112}{5}=1.6

P-value : P(z>120)=P(z>1.6)=1-P(z

1-0.9452007=0.0547993\approx0.055

Hence, the probability that they will have to pay the penalty is 0.055 .

5 0
3 years ago
I NEED HELP QUICK!!!!!! WILL MARK BRAINLYST
Elodia [21]

The first one is a proportional relationship.

6 0
3 years ago
Other questions:
  • How do we express twice the sum of b and 4
    11·1 answer
  • Find the standard form of the quadratic equation: f(x)=(2x-1)(x+4)
    11·1 answer
  • Explain and show how to find the square root of 50 to the nearest tenth
    11·1 answer
  • WILL GIVE BRAINLIEST!!!​
    14·2 answers
  • Systolic Blood Pressure Assume that the mean systolic blood pressure of normal adults is 120 millimeters of mercury and the stan
    12·1 answer
  • 7. For a school fundraiser, Elena will make T-shirts. She will order T-shirts and print graphics on them. Elena must spend $349
    6·1 answer
  • ‏Good morning, what is the
    14·1 answer
  • What is the greatest common factor (GCF) of 60 and 90?
    15·2 answers
  • Does anyone mind helping?
    6·2 answers
  • What is the solutior to the equation 5j = 2/3
    15·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!