Answer:
Step-by-step explanation:84% of a contractor’s jobs involves electrical work. 75% of a contractor’s jobs involve plumbing work. Of the jobs that involve plumbing, 90% of the jobs also involves electrical work. Let E = jobs involving electrical work L = jobs involving plumbing work Suppose one of the contractor’s jobs is randomly selected. Using the sixth Excel worksheet, a) Find P(E). 0.84 b) Find P(L). 0.75 c) In words, what does E | L mean? d) Find P(E | L). e) Find P(E and L). f) Are E and L independent events? Why or why not? g) Find P(E or L). h) Are E and L mutually exclusive? Why or why not
Answer:
4
Step-by-step explanation:
Since this is a right triangle, we can use trig functions
sin theta = opp / hyp
sin 30 = x/8
8 sin 30 =x
8 (1/2) = x
4
Answer:
2
Step-by-step explanation:
rounded down
Answer:
A , B , C
Step-by-step explanation:
1) find the slope of the given line
slope = (-a/b) = (-8/4) = -2
two parallel lines have the same slope
A : correct
B : (-a/b) = -16/8 = -2 (correct)
C : correct
D : wrong (2 is different from -2)
The y intercept is -4 and the slope is 2