Answer:
The estimated sum is ≈10
Step-by-step explanation:
This depends on how your professor wants you to estimate sums. Logically, though, a value of nearly 4 and a value of just over 6 add to about 10. The exact answer would be a bit over 10, at ≈10.14117
Anytime x = 0 in a point the y intercept is immediately defined.
y = mx + b The y intercept is b
y = 0 + b
0 = 0 + b
b = 0
What you know so for is
y = mx + b
y = mx since b = 0
7 = m*1
m = 7
The answer is y = 7x <<<<<<Answer.
<h2>
Answer:</h2>
Prediction for the number of unsuccessful rolls is 15.
<h2>
Step-by-step explanation:</h2>
There is
chance of rolling number 6 on the cube. If we want to find out what is the prediction for rolling number 6 in 18 rolls, we need to multiply
which is 3. So if we roll a cube 18 times, we will probably got number 6 three times. When we subtract 3 from 18 (18-3), we get 15. That is the answer to your question.
I hope I helped you. I will be really happy, If you mark my answer as the brainliest.Your David
Answer:
4.5
Step-by-step explanation:
7.3= y + 2.8
Subtract 2.8 from both sides
7.3 = y+ 2.8
-2.8 -2.8
--------------------
y = 4.5
<u>Supposing 60 out of 100 scores are passing scores</u>, the 95% confidence interval for the proportion of all scores that are passing is (0.5, 0.7).
- The lower limit is 0.5.
- The upper limit is 0.7.
In a sample with a number n of people surveyed with a probability of a success of
, and a confidence level of
, we have the following confidence interval of proportions.
In which
z is the z-score that has a p-value of
.
60 out of 100 scores are passing scores, hence 
95% confidence level
So
, z is the value of Z that has a p-value of
, so
.
The lower limit of this interval is:
The upper limit of this interval is:
The 95% confidence interval for the proportion of all scores that are passing is (0.5, 0.7).
- The lower limit is 0.5.
- The upper limit is 0.7.
A similar problem is given at brainly.com/question/16807970