Answer:
The answer is: the amount of inventory at the end of the year was $1,583 using the average cost method.
Explanation:
The average cost method calculates the cost of inventory by dividing the total costs of goods by the total units.
- 10 units x $60 = $600
- 25 units x $65 = $1,300
- 30 units x $68 = $2,040
- 15 units x $75 = $1,125
The total cost of inventory is $5,065 ($600 + $1,300 + $2,040 + $1,125)
The total units in inventory are 80 (10 + 25 + 30 +15)
To find the average cost per unit = $5,065 / 80 units = $63.31
If 25 units were left at the end of the year, then the total cost of inventory is $63.31 x 25 = $1,582,81 or $1,583
Answer:
The correct option is (b)
Explanation:
According to the scenario, the foreign currency that original sold at the market is shown below:
= (Forward rate to Jan 15 - Spot rate) × paymen made
= ($0.00089 - $0.00082 ) × 20 million
= $0.00007 × 20,000,000
= $1,400 premium
hence, the foreign currency that originally sold at the market is $1,400 premium
Therefore the correct option is (b)
Answer:
option c is correct
Explanation:
option c is correct
cartel member are having an advantage to withraw or cheat from contract at any time.
cartel word is first used in 1930 by one drug dealer in mexico. it is collective group of two or more participant with motives to dominate in entire market and make huge profit.
Answer:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
Explanation:
3. MOH allocated to job= predetermined MOH rate * actual amount of allocation base used by the job
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. the quantity of a cost driver required by a particular job is multiplied by a predetermined overhead rate to determine the amount of overhead cost applied to the job.
An estimate is made of
- the amount of manufacturing over head that will be incurred during a specific period of time and
- the amount of the cost driver ( or activity base) that will be used or incurred during the same time period. the predetermined overhead rate is computed as follows
Predetermined Overhead Rate= Budgeted Manufacturing Overhead Cost/ Budgeted amount of cost driver
The predetermined overhead rate is used to apply manufacturing overhead costs to production jobs. The quantity of the cost driver ( or activity base ) required by a particular job is multiplied by the predetermined overhead rate to determine the amount of overhead cost applied to the job.