Solution: Estimated time for the work is 40 hour work week.
Estimated payment to 3 laborers working 40 hours at cost $14 per hour is:
$1680
Estimated payment to 6 masons working 40 hours at cost $24 per hour is:
$5760
Estimated cost of material = $3143
Contractor wishes to make a profit of $500
Therefore, the mathematical expression that will give the estimated cost of the job is:

The estimated total cost is:
Cost =$11083
Answer:
5
Step-by-step explanation:
An area is just a number squared, so we need to find the square root of the area.
Square root of 25 = 5
So each edge is 5 feet.
Hope this helps :)
I would go with Jesses survey.
Unlike everyone else’s survey Jesse chose 6th grade students in random, causing a more unbiased research.
Answer:
first three
Step-by-step explanation:
go directly to the x- value ed2020
Answer:
A) 147.6 sq m
Step-by-step explanation:
Separate the pyramided out into 4 triangles and add those
3 of them (sides) will be the same

This is one half of the side, multiply by 2 to get the area of the entire side, 40 square m.
The area of all 3 sides together is 40*3 = 120 sq m
For your base, your height will be 6.9 and your base is 4
A = 13.8 sq m
multiply by 2 again for the entire base
A=27.6 sq m
Now add both
120 + 27.6