Given:
A company wants to select 1 project from a set of 4 possible projects.
Consider the options are:
a.
b.
c.
d. 
To find:
The constraints that ensures only 1 will be selected.
Solution:
It is given that the company wants to select 1 project from a set of 4 possible projects. It means the sum of selected projects must be equal to 1.

Therefore, the correct option is (a).
Answer:If you have two parallel lines and shift both to the left by the same amount, that does not alter the distance between the lines. Thus, c is correct.
Step-by-step explanation:
Answer:
211/40, B
Step-by-step explanation:
Make it an improper fraction:
5 x 40 = 200, 200 + 11 = 211
211/40, B