First four tasks = 8 seconds
Next four tasks = 8 seconds
Last two tasks = 8 seconds
The total number of seconds to perform all tasks is 24 seconds.
The throughput, which would be the number of tasks per second, is calculated by taking the number of tasks and dividing by the number of seconds:
10 tasks / 24 seconds = 5/12 or 0.4167 tasks per second
There are two common command lines used in creating design assembly. The 'push' and 'pull' command. Both allows you to get parts from the original predelivered content's source desgian and recreate the design faster and with less memory.
Answer:
All of the above
Explanation:
An interrupt priority scheme is a system which decides the priority at which various work is done and it perform all of the above mention task so therefore all of the above is the right answer.
Answer:
Unlike raster graphics, which are comprised of colored pixels arranged to display an image, vector graphics are made up of paths, each with a mathematical formula (vector) that tells the path how it is shaped and what color it is bordered with or filled by.
Explanation:
Answer:
C. Use the SOAP API to maintain the related SObject_share records
Explanation:
In order to ensure that Universal Containers have complete control over the system, the company needs to use certain requirements. This is to ensure that non-authorized persons do not have any access to the information. Based on the information provided in the question, the correct option is option C.