1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
maxonik [38]
3 years ago
5

How does links helped a student like you in navigating the different available websites?

Computers and Technology
1 answer:
Andrej [43]3 years ago
4 0

Answer:

Users don’t expect to land somewhere completely unrelated.

You might be interested in
You have just performed a cpm analysis and have found that more than one path through the project network has zero slack values.
Alex787 [66]

Answer:

There are multiple critical paths

Explanation:

The critical path method (CPM), or critical path analysis (CPA), is an algorithm for scheduling a set of project activities. It is commonly used in conjunction with the program evaluation and review technique (PERT). A critical path is determined by identifying the longest stretch of dependent activities and measuring the time required to complete them from start to finish.

The essential technique for using CPM is to construct a model of the project that includes the following:

  •    A list of all activities required to complete the project (typically categorized within a work breakdown structure),
  •    The time (duration) that each activity will take to complete,
  •    The dependencies between the activities and,
  •    Logical end points such as milestones or deliverable items.      

Using these values, CPM calculates the longest path of planned activities to logical end points or to the end of the project, and the earliest and latest that each activity can start and finish without making the project longer. This process determines which activities are "critical" (i.e., on the longest path) and which have "total float" (i.e., can be delayed without making the project longer).

considering the above function of the cpm analysis because you have multiple path, there is tendency that more than path through the project network will have zero slack values.

5 0
3 years ago
I know that this will be taken down for not being a real question but is anyone else not able to search for anything? I can type
Schach [20]

Answer:

Sameee

Explanation:

6 0
3 years ago
Harvey is creating a presentation for his school project. He wants to have the same look on all the slides of his presentation.
Misha Larkins [42]
He should use PowerPoint and the design should be feathered
8 0
4 years ago
What does a cascading style sheet resolve a conflict over rules for an element?
Margaret [11]
I Think The answer is d I hope it helps
4 0
3 years ago
Abrupt changes in road surface or the shape of the road may indicate
Zanzabum

Answer:

D. a potential hazard

Explanation:

Abrupt changes in road surface or the shape of the road may indicate a potential hazard.

5 0
3 years ago
Read 2 more answers
Other questions:
  • What will happen if you change data that is used in a formula
    10·1 answer
  • How to get an hdmi working from a chromebook?
    6·2 answers
  • The component in a disk brake unit acts as a return spring and allows the pad to move a ay from the rotor is the
    6·1 answer
  • Which method deletes a footer from a document?
    9·2 answers
  • If you want to present slides to fellow students your coworkers which productivity software should you use to create them
    15·2 answers
  • Define a function UpdateTimeWindow() with parameters timeStart, timeEnd, and offsetAmount. Each parameter is of type int. The fu
    10·1 answer
  • Three different numbers need to be placed in order from least to greatest. For example, if the numbers are ordered 9, 16, 4, the
    15·1 answer
  • Which data type can store decimal or fractional numbers?
    15·2 answers
  • I need help!! I decided to go back to college this year and am taking Intro to Logic and Programming. I have an assignment due t
    5·1 answer
  • The other term for template document is _______.
    13·2 answers
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!