-7.5 / -2.5 = 3
------------
Answer:
C. $97
Step-by-step explanation:
The average of his wage for all 15 days is the sum of all wages for the 15 days divided by 15.
average wage for 15 days = (sum of wages for the 15 days)/15
The amount of wages during a number of days is the product of the average wage of those days and the number of days.
First 7 days:
average wage: $87
number of days: 7
total wages in first 7 days = 7 * $87/day = $609
Last 7 days:
average wage: $92
number of days: 7
total wages in last 7 days = 7 * $92/day = $644
8th day:
wages of the 8th day is unknown, so we let x = wages of the 8th day
total wages of 15 days = (wages of first 7 days) + (wages of 8th day) + (wages of last 7 days)
total wages of 15 days = 609 + x + 644 = x + 1253
average wage for 15 days = (sum of wages for the 15 days)/15
average wage for 15 days = (x + 1253)/15
We are told the average for the 15 days is $90/day.
(x + 1253)/15 = 90
Multiply both sides by 15.
x + 1253 = 1350
Subtract 1253 from both sides.
x = 97
Answer: $97
Answer:
![Var(X) = E(X^2) -[E(X)]^2 = 4.97 -(1.61)^2 =2.3779](https://tex.z-dn.net/?f=%20Var%28X%29%20%3D%20E%28X%5E2%29%20-%5BE%28X%29%5D%5E2%20%3D%204.97%20-%281.61%29%5E2%20%3D2.3779)
And the deviation would be:

Step-by-step explanation:
For this case we have the following distribution given:
X 0 1 2 3 4 5 6
P(X) 0.3 0.25 0.2 0.12 0.07 0.04 0.02
For this case we need to find first the expected value given by:

And replacing we got:

Now we can find the second moment given by:

And replacing we got:

And the variance would be given by:
![Var(X) = E(X^2) -[E(X)]^2 = 4.97 -(1.61)^2 =2.3779](https://tex.z-dn.net/?f=%20Var%28X%29%20%3D%20E%28X%5E2%29%20-%5BE%28X%29%5D%5E2%20%3D%204.97%20-%281.61%29%5E2%20%3D2.3779)
And the deviation would be:

Work done on cart
:
W
=
6000
J
Kinetic energy of cart
:
E
K
=
6000
J
Explanation:
Work done
W
is defined as the product of force
F
and distance
s
:
⇒
W
=
F
⋅
s
Let's substitute the values of
F
and
s
into the equation:
⇒
W
=
300
N
⋅
20
m
⇒
W
=
300
kg
⋅
m s
−
2
⋅
20
m
⇒
W
=
300
⋅
20
kg
⋅
m
2
s
−
2
⇒
W
=
6000
kg
⋅
m
2
s
−
2
∴
W
=
6000
J
The gain in kinetic energy
E
K
is the same amount as the work done moving the cart:
∴
E
K
=
6000
Answer:
$0.40
Step-by-step explanation:
20 pounds = $8.00
1 pound = $8.00÷20
1 pound = $0.40