<h3>Although System analysis offers an extensive range of benefits it might also have some disadvantages. One of the main disadvantages which is mostly overlooked is the risk of too much analysing which may be costly and time consuming. It is therefore part of the analyst's job to find the right balance.</h3>
Answer:
Optimistic duration
Explanation:
The following three concepts are Project management concepts:
Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.
Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc
Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.
Which of the following is the estimate of the minimum amount of time it would take to perform a task?
The answer is Optimistic duration
The thing which the given program accomplishes is that it creates a method, declares variables, and executes commands if they meet the conditions in the code.
<h3>What is a Conditional Statement?</h3>
This is a type of statement that executes a line of code if a condition is not met.
Some types of conditional statements are:
- IF statement
- IF-ELSE statement
- Nested If-else statement.
- If-Else If ladder.
- Switch statement.
No, that is not the desired output because the integer should be less than 20.
Read more about conditional statements here:
brainly.com/question/11073037
#SPJ1