1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
GaryK [48]
3 years ago
10

when you insert a new column, the existing columns are shifted to the ____ and the new column has the same width as the column d

irectly to its left
Computers and Technology
1 answer:
Citrus2011 [14]3 years ago
5 0

Answer:

when you insert a new column, the existing columns are shifted to the right and the new column has the same width as the column directly to its left.

You might be interested in
Mathematics and computer science share many concepts.
Nastasia [14]

Answer:

Recursion

Explanation:

7 0
3 years ago
Read 2 more answers
(40 pointsAnd brainliest answer ASAP) Maria is recording her friend’s graduation ceremony. How can Maria ensure that the video i
snow_lady [41]

Answer:

camera

Explanation:

3 0
4 years ago
Limitations of systems analysis and design​
Sonja [21]

Answer:

<h3 />

Explanation:

<h3>Although System analysis offers an extensive range of benefits it might also have some disadvantages. One of the main disadvantages which is mostly overlooked is the risk of too much analysing which may be costly and time consuming. It is therefore part of the analyst's job to find the right balance.</h3>
6 0
3 years ago
Which of the following is the estimate of the minimum amount of time it would take to perform a task? (Points : 2) Minimal durat
kondor19780726 [428]

Answer:

Optimistic duration

Explanation:

The following three concepts are Project management concepts:

Optismitic duration: Estimation of the shortest duration of a task, taking into account the difficulty, etc.

Pessimistic duration: Estamation of the longest duration of a task, taking into account the difficulty, etc

Expected duration: Expected duration of a task, kind of a compromise between the optmistic duration and the pessimistic duration.

Which of the following is the estimate of the minimum amount of time it would take to perform a task?

The answer is Optimistic duration

7 0
3 years ago
Consider the following code using the posix pthreads api:
Lubov Fominskaja [6]

The thing which the given program accomplishes is that it creates a method, declares variables, and executes commands if they meet the conditions in the code.

<h3>What is a Conditional Statement?</h3>

This is a type of statement that executes a line of code if a condition is not met.

Some types of conditional statements are:

  • IF statement
  • IF-ELSE statement
  • Nested If-else statement.
  • If-Else If ladder.
  • Switch statement.

No, that is not the desired output because the integer should be less than 20.

Read more about conditional statements here:

brainly.com/question/11073037

#SPJ1

8 0
2 years ago
Other questions:
  • Powerpoint provides only three picture effects. true or false.
    5·1 answer
  • 1. Create an interface called Runner. The interface has an abstract method called run() that display a message describing the me
    8·1 answer
  • What additional information could you add to a sketch to provide other team members with a more accurate design drawing?
    9·1 answer
  • A(n) ____ is a location on your computer screen where you type text entries to communicate with the computer’s operating system.
    9·2 answers
  • How can rows be added to a table? Check all that apply
    13·2 answers
  • Mention 5 advantages of internet​
    8·1 answer
  • Why is it preferable to code web pages in HTML format?
    10·2 answers
  • While num_printed != num_stars: print('*') Sample output with input: 3 * * *
    15·1 answer
  • How to mark a discussion as read on canvas dashboard.
    10·1 answer
  • How can the absolute age of a rock be determined ?
    9·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!