Answer:
x=4. y= 7/2----3.5
Step-by-step explanation:
for B the answer could also he m=0, b=7/2 if you're looking for the function
if you want the alt version it could also be y=3 1/2/y=3.5
Well, in the store, when you buy something, there are decimals, also, speed limit for your car, and time, but that is not an exact thing for this question, because 60 can't be a decimal. you cant make it so you can show 60 seconds as a decimal without an irrational number. sometimes, the number just goes on forever.
Answer:
Step-by-step explanation:
Given that ;
Carlos needs 1.7 meters of wire for one project &
0.8 meters of wire for another project
we are to shade the model to represent the total amount of wire Carlos needs .
NOW;
For both projects ; Carlos needs ( 1.7 + 0.8) meters of wire = 2.5 meters of wire
In the attached files below. the first picture shows the diagram attached to the question and the second one shows the shading of the model which represent the total amount of wire Carlos needs.
Answer:
JK= 8x-4
Step-by-step explanation:
This is achieved by adding JM And MK because M is the midpoint of JK.