The area of the metal strips:
A = L * W , where L stays for length and W stays for wirth.
A = 11 ft * 2 ft ;
A = 22 ft^2.
If it costs $6 per foot:
Total cost = 22 * 6 = $132.
Answer: The total cost of a metal strip is $132.
Answer:
E 0.923
Step-by-step explanation:
The Z score is a measurement used in statistics to determine the relationship between a value and a mean of a group of values measured as standard deviation from the mean. The z score (z) is given as:
, Where μ is the mean, σ is the standard deviation and x is the value.
Given that:
σ = 7, μ = 80 and x = 90

From the normal distribution table, P(X < 90) = P(z < 1.43) = 0.923
Answer:
25/39
Step-by-step explanation:
For division of mixed numbers, it often works well to first convert them to improper fractions. Then the division proceeds in the usual way: "invert and multiply", or "dot, swap."
__

_____
<em>Additional comment</em>
Your graphing calculator can do this, too.
Answer:
10 hours
Step-by-step explanation:
let x be the total number of hours
Amazing design total charge = 45x+250
super structures total charge = 60x+100
both companies charge the same amount when both equation equals
45x+250=60x+100
60x-45x=250-100
15x=150
x=10
therefore at 10 hours both companies will charge the same amount