Answer:
0.1463
Step-by-step explanation:
Number of observations = 10
Sample mean = 10.5
Sum of standard deviation = 264.5
X = 14
We are to calculate The leverage statistic for study hour 14 using the data above
= 1/10 + (14-10.5)²/264.5
= 1/10 + 3.5²/264.5
= 0.1 +12.25/264.5
= 0.1+0.04631
= 0.1463 is the leverage statistic for the study
Step-by-step explanation:
(a)
the probability of parcels weighing 35oz or less is
0.841
the probability of parcels weighing 14oz or less is
0.023
the probability of parcels weighing between 14 and 35oz is the probabilty of 35oz minus the probability of 14oz
0.841 - 0.023 = 0.818
the percentage is the probability × 100 = 81.8%
(b)
the probability of parcels weighing more than 49oz is 1 minus the probability to weigh less than 49oz.
the probability to weigh less than 49oz is
0.99865
so, the probability to weigh more than 49oz is
1 - 0.99865 = 0.00135
the percentage is again probability×100 = 0.14%
Given,
A sign company charges $28 per yard for each custom-made banner.
Ms.Gill orders two banners that are each 178 yards long, and one banner that is 258 yards long.
To find,
Total money paid by Ms. Gill.
Solution,
Total length of 2 banners of 178 yards = 356 yards
Third banner is 258 yards long.
Total length of the banners = 356 + 258
= 614 yards
The cost of each banner = $28 per yards.
Total amount paid by Ms. Gill is :
= $28 × 614
= $17,192
Hence, she will pay $17,192 for all the three banners.
Answer:
2
Step-by-step explanation:
We can write a proportion to determine
42 people 6 people
---------------- = ----------------
14 boats x boats
Using cross products
42x = 6*14
42x =84
Divide each side by 42
42x/42 = 84/42
x = 2
They will need 2 boats
Step-by-step explanation:
If there is a growth of 5.6% per time unit. The function is
f(t) = 1600 * (1.056)^t