Answer:
11.18%
Step-by-step explanation:
Total = 340
Completed = 302
Not completed = 340 - 302 = 38
Not completed% = 38/340*100% = 11.18%
Answer:
c
Step-by-step explanation:
Answer:
they both charge the same cost per linear feet
Step-by-step explanation:
It appears that each company has a base charge for installation, which is the dollar value where each line begins at the y-axis. Both lines have the same slope and if you count, the cost is $75 per 5 linear feet.
You do a multiplication of 2/5 times 25 and you get 50/5 which is equal to 10. So @0 students ride the school bus.
The correct answer is 63 minutes, what you do is divide 36/20 to get 1.8 then multiply 35*1.8 to get 63.
Brainliest answer?