1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
e-lub [12.9K]
2 years ago
9

A bag contains 5 blue balls, 4 red balls, and 3 orange balls. If a ball is picked from the bag at random, what is the probabilit

y that it is a blue ball? Answers have been rounded to the tenths place
Mathematics
2 answers:
sergiy2304 [10]2 years ago
6 0

Answer:

60%

Step-by-step explanation:

hope this helps

Marysya12 [62]2 years ago
5 0

<u>Answer:</u>

  • There is a 41.7% chance that you got a blue ball.

<u>Step-by-step explanation:</u>

<u>Total number of blue balls/Total number of balls x 100 = Chance of getting a blue ball</u>

  • => 5/12 x 100
  • => 5/6 x 50
  • => 5/3 x 25
  • => 125/3
  • => 41.7

Hence, <u>there is a 41.7% chance that you got a blue ball.</u>

Hoped this helped.

BrainiacUser1357

You might be interested in
HELP PLEASE I NEED TO PASS TOMORROW
Lesechka [4]
I think that it’s 16 probably
6 0
3 years ago
If m&lt;4= 86° what are the measures of the other seven angles in the figure
Vsevolod [243]

Answer:

below

Step-by-step explanation:

IF l₁ and l₂ are parallel, then:

Angles 2, 4, 5, 8 all equal 86 degrees

Then angles 1, 6, 3 , 8 all equal 180 - 86 which is 94 degrees

5 0
3 years ago
Read 2 more answers
1+-2 =? please help mee
Kamila [148]
A positive plus a negative will equal a negative #.
1+-2= -1
5 0
3 years ago
Read 2 more answers
A masonry contractor is preparing an estimate for building a stone wall and gate. He estimates that the job will take a​ 40-hour
kodGreya [7K]

Solution: Estimated time for the work is 40 hour work week.

Estimated payment to 3 laborers working 40 hours at cost $14 per hour is:

3\times 40\times 14= $1680

Estimated payment to 6 masons working 40 hours at cost $24 per hour is:

6\times 40\times 24= $5760

Estimated cost of material = $3143

Contractor wishes to make a profit of $500

Therefore, the mathematical expression that will give the estimated cost of the job is:

Cost = 1680+5760+3143+500

The estimated total cost is:

Cost =$11083




5 0
3 years ago
Read 2 more answers
Help me asap please!
Fantom [35]
1.82 x 10^-6

When it is a negative number, you move the decimal to the left.

0.00000182
6 0
3 years ago
Other questions:
  • Person is randomly selected. what is the probability that the person is:
    11·1 answer
  • In a bowl of marbles, there are 5 red ones, 6 green ones, and 4 blue ones. If two marbles are chosen at random without replaceme
    14·1 answer
  • Please Help with this question...Will Mark as Brainliest....Please Explain your work!
    9·1 answer
  • Answer this for 15 POINTS and BRAINLIEST
    14·1 answer
  • the stage for a school play is 70 feet wide. A set for the play will be built in two sections, separated by 5 feet in the center
    12·1 answer
  • The area of a rectangle is 36 square centimeters. The length is 1 foot more than twice the width.
    7·2 answers
  • A triangle has side lengths of 6, 8, and 10. Is it a right triangle?
    13·2 answers
  • Becky’s mother works in an office, and her father works in a hospital. They both walk to work from home every day. Each unit on
    8·2 answers
  • Solve for x 10 points<br> 3 1/5−1/4x=−4/5
    14·1 answer
  • What is the volume of a cone with a height of 27 cm
    10·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!