_Brainliest if helped!
1 over 64
8^2 = 64 , 8^-2 = 1/(8^2) = 1/64
Answer:
True
Step-by-step explanation:
The variable overhead rate variance refers to the difference in two variables.
The Variables are
1. The actual variable manufacturing overhead
2. The expected variable overhead given the number of hours worked
Labor rate variance is evaluated by
AH(AR - SR)
AH = actual hours
AR = actual rate
SR = standard rate.
The variable overhead rate variance is also calculated the same way except that it replaces the direct labor rates with variable overhead rates
Answer:98mm
Step-by-step explanation:
You add the length and width together and then multiply by 2
Answer:
-6x - 8
Step-by-step explanation:
-2(3x+4) = -6x - 8
this means the -6x - 8 is equivalent