Answer:
Jim's path is the critical path on this activity graph.
Step-by-step explanation:
Critical Path:
Critical path is the the longest path in the project task paths. It shows the least amount of time in which project can be completed. It can be find by looking at the longest path in the network diagram of the project; not in term of nodes or activities instead in term of days.
In given case:
Path 1 Bill task's total duration= 6 days
Path 2 Jim's task's total duration= 17 days
Path 3 Betty task's total duration= 7 days
Path 4 Cynthia task's total duration= 14 days
Hence the longest path i.e. critical path is of Jim's activity path !
Answer:
B is the answer
Step-by-step explanation:
because it said 8 thousands so you know its not D and it says 7 tens so you know its not C and for 9 sense the hundredths has (ths) you know it's not A so the answer is B.
Answer:
The expression to show the average daily change in temperature can be given by :
⇒
°C
Step-by-step explanation:
Changes in the temperature of city as reported by newspaper :
Day 1: 2.64° C
Day 2:
°C
Day 3: -0.35°C
Day 4:
°C
The average daily change in temperature can be calculated as
⇒
°C
The fractions can be written in decimals
⇒
°C
⇒
°C
⇒
°C [Average daily change in temperature.]
Answer:
The value of the test statistic is -3.14.
Step-by-step explanation:
Test statistic:

In which X is the sample mean,
is the expected value,
is the standard deviation and n is the size of the sample.
A company advertises that its cans of caviar each contain 100 g of their product.
This means that 
They calculate a sample mean weight of 99 g and a sample standard deviation of 0.9 g. Sample of 8 cans.
This means that 
So the test statistic will be given by:



The value of the test statistic is -3.14.
Answer:
14/21
Step-by-step explanation:
14/21 is divisible by 7, and can reduce to 2/3