I believe you meant "why is the number of shifts multiplied by approximately 4.5 to obtain the total number of operators required to run the plant"
Answer and Explanation:
There are 3 shifts per day, 49 weeks per year and 5 shifts per operator per week
To get total number of operators required to run the plant, we multiply number of shifts in a year by number if operators per shift.
49 weeks×5 shifts= 245 shifts per operator per year
365×3 shifts= 1095 shifts per year
1095/245=4.5 operators per shift
total number of operators required to run the plant(per day) = 4.5×3= 13.5 approximately 14
total number of operators required to run the plant(per year) =4.5×1095=4927.5 approximately 4928
Answer: x = 1
Step-by-step explanation:
5 ( 2x - 8 ) + 15 = -15 (write the equation)
5 ( 2x - 8 ) = -30 (subtract by 15 on both sides)
2x - 8 = -6 (divide by 5 on both sides)
2x = 2 (add 8 to both sides)
x = 1 (divide by 2 on both sides)
If two positive angles have a sum of 180 degrees, they are called supplementary angles.
24v9w9 + 28v5w7y8
Also sub to Stariceie E
You need to do 10 divided by 4. Each friend would get 2.5 pounds of a nut.