C. One who signed the note and promised to pay at maturity
Answer:
C. team composition
Explanation:
Team composition -
It is the overall combination of the people with different characteristics in a team , where the people interact in order to attain a common goal , is known as team composition .
The team could have homogeneous or heterogeneous members .
hence , from the question information , Jamal is concerned with the team composition .
Answer:
C. The system is functioning correctly and providing accurate information
Explanation:
Reliability refers to the ability of a system or a machine to perform its intended function with minimal or nil breakdown. Consistency and validity of data from the performance of a system or a piece of equipment indicate its reliability. It is the possibility of failure-free operation of a system.
Reliability will, therefore, ensure a system is performing its function with minimal interruptions resulting from failures. It guarantees consistency in the results from operations. With reliability, production happens when it is needed.
Answer:
$27,541
Explanation:
Calculation to Determine the activity cost
Activity Cost
Set-up $75.00
Movement:
Batch 60V $66
(Three batch moves *22.00 per batch)
Weight $750
(150 pounds*0.10 per pound*50)
Inspection $200
(Two sets of inspections*50*2.00 per unit)
Drilling $750
(3.00 per hole*five holes in each unit*50)
Welding $24,000
(6.00 per inch*80*50)
Shaping $800
(32.00 per hour*(30 minutes/60)*50)
Assembly $900
(18.00 per hour*1*50)
Total $27,541
Therefore the activity cost is $27,541