I’m pretty sure it’s server
Answer:
Explanation:
demo.java Shapes 2 Shapes Polymorphism Create a set of classes derived from an abstract class Shape, which provides a common interface, for managing various 2D geometric shapes. In our model, each Java object will represent a shape somewhere in a Cartesian coordinate system. However, note that unlike in Mathematics, the positive y-axis grows down from the origin. Shapes All shapes have the following properties: color, area, perimeter, location, and bounds. Shapes are mutable, for example any shape can be moved.
Answer:
Follows are the matching to this question:

Explanation:
While time-consuming or prone to errors mechanical adjustments to both the referential, databases could be configured with four measures to engine violations. The restricted action causes the insert, update, and removes to only be denied. Set Null to NULL sets the invalid external key, whereas Set Default to a specific core consideration specified in SQL sets a default foreign key. Its Cascade operation spreads the main changes in external keys.
1 Film Roll Vs SD card.
2 No LCD Display Vs LCD Display
3 No mega Pixels Vs Mega Pixels
4 Zero Optical zoom Vs Optical Zoom
5 No Picture Modes Vs Different Picture Modes
6 Limited Number of Pics per roll Vs unlimited number of pictures depending upon the size of a Card
7 Hassle of developing pictures Vs no hassle, simply transfer them to the pc/laptop
8 Limited features Vs multiple features
hope this helps
Mike needs to write the primary objectives of a project in a project plan. He should write this under the SCOPE section of the project plan.
Explanation:
- Project scope is the part of project planning that involves determining and documenting a list of specific project goals, deliverables, features, functions, tasks, deadlines, and ultimately costs.
- It is what needs to be achieved and the work that must be done to deliver a project.
- The Scope of Work (SOW) is the area in an agreement where the work to be performed is described.
- The SOW should contain any milestones, reports, deliverables, and end products that are expected to be provided by the performing party. The SOW should also contain a time line for all deliverables.
- The scope is simply all the work that needs to be done in order to achieve a projects objectives.
- A project scope, or project scope statement, is a tool used to describe the major deliverables of a project including the key milestones, high level requirements, assumptions, and constraints.