Answer:
X= 30-4r/-6
Step-by-step explanation:
1. Move the 9 to the other side. (21+9=30)
2. subtract the 4r and move it to the other side (-6x=21-4r)
3. divide both sides by -6
2x + 3 /12 = 2x/8
⇒ 48x/24 + 6/24 = 6x/24
⇒ (48x+ 6)/24= 6x/24
⇒ 48x+ 6 = 6x
⇒ 48x- 6x= -6
⇒ 42x= -6
⇒ x= -6/42
⇒ x= -1/7
<span>
x=-1/7~</span>
Work problems are solved by first figuring out how much of the job they can do in each hour. Shawn can do 1/4 of the job in an hour and Ellie can do 1/6 of the job in an hour. 1/6+1/4=2/12+3/12=5/12. This means that they can do 5/12 of the job an hour. This means that together they can do the job in 2 2/5 hours. The foreman is obviously wrong because first of all Shawn can do it alone in 4 hours, so with Ellie he will do it faster, and second of all 2 2/5<5. Hope this helped!
Answer:
shifted left 7 & shifted down 3
Step-by-step explanation: