Answer: 0.9332.
Step-by-step explanation:
Claim : College Algebra final exam score of engineering majors equal to 88.
Given that : The test statistic is z equals to 1.50.
To find the p-value (Probability value), we use standard normal distribution table, and search the p-value corresponds to the z-score.
In a Standard Normal Distribution Table below, the p-value corresponds z equals 1.5 is 0.9332.
Hence, the p-value is 0.9332.
Answer:
b) 25/100 x 79
= 19.75
= 79 - 19.75
= $59.25 (before tax)
7/100 x 59.25
= 414.75/100
= 4.15
= 59.25 + 4.15
= $63.4 (after adding tax)
First we have to take out the percentage of discount and minus it from the total cost . To find the discounted price with tax, we have to take out the percentage of the tax from the discounted amount and add it to the discounted amount to get the total cost.
Step-by-step explanation:
Answer:
No Solution
Step-by-step explanation:
There is no number that can replace x to make the equation true.
Answer:
[see below]
Step-by-step explanation:
Volume of a triangular prism is: 
We are given the base of 5, the length of 12, and the height of 8. All measurements are in meters.

The volume of the prism should be 240 square meters.
Answer:
= (∛(100x))/5
Step-by-step explanation:
Given the expression; ∛(4x/5)
To simplify this we need to make denominator a perfect cube.
So multiply and divide 25 inside the cube root, so that the denominator will become a perfect cube of 5.
∛(4x/5) = ∛((4x/5)×(25/25))
= ∛(100x/125)
= ∛(100x/5³)
<u>= (∛100x)/5</u>