Information to develop a project network is collected from the work breakdown structure
<h3>
Work breakdown structure </h3>
Work breakdown structure (WBS) is a structure showing the steps needed to be taken so as to complete a project.
WBS is presented in visual format and it is usually arranged based on hierarchy.
Information to develop a project network is collected from the work breakdown structure
Find out more on Work breakdown structure at: brainly.com/question/6197566
Answer:
to learn about their cultural heritage and historical significance
The correct answer is 1234.
Answer:
public class Invitation
{
private String hostname;
private String address;
public Invitation(String n, String a)
{ // constructor that accepts two strings.
hostname = n;
address = a;
}
public String getHostname()
{
return hostname;
}
public void setAddress(String a)
{
address = a;
}
public String invite(String guest)
{
return "Hello" +guest+ ", you are invited to my party at " +address+". "+hostname+".";
}
public Invitation(String host, String address)
{
this.address = address;
this.hostname = host;
}
}
Explanation:
The Java program defines a class called "Invitation". The class constructor has two string arguments or parameters for the host of the event and the address. The invite method is used to generate the string invite message with the name of the guest as the argument. Use the "setAddress" method to set a new location of the event and the "getHostname" to get the name of the event host.
Probably the minimum number in the given set so 5.