Step-by-step explanation:
convert to slope-intercept form
y = -2x + 4
Answer:
The number of FTE needed to be hired to cover the additional procedures per 7.5 day work is:
= 1.
Step-by-step explanation:
a) Data and Calculations:
Endoscopies EP Studies Total
Projected number of studies 60 5 65
Time in minutes for per study 5 15
Total time required (in minutes) 300 75 375
Full-time Employee (FTE) works 7.5-hour day or 450 minutes (7.5 * 60) per day.
b)The number of full-time employees (FTE) needed to be hired to cover the additional procedures per 7.5-day work is 1. The FTE has 450 minutes available for the additional procedures. She will only require 375 minutes. Therefore, she has extra (idle) time of 75 (450 - 375) minutes per workday.
-89/40. First, u need to make a common denominator. In this case, u should use 40. Multiply he first term by 5, which get u -25/40. Multiply the second term by 8, which gets u -64/40. Now add the 2 negatives: -25/40 + (-64/40) u get -89/40