Answer:
C. No, the Normal/large sample condition is not met.
Step-by-step explanation:
There is only 20 cup and for a sample to meet the Normal/large sample condition it must be greater than 30 samples or have a normal distribution or have no skewness or outliers
You are multiplying 975 by 0.034
33.15
Answer: 48 sold-out performances must be played in order for you to break even.
Step-by-step explanation:
Let x represent the number of sold-out performances must be played in order for you to break even.
You invest in a new play. The cost includes an overhead of $30,000, plus production costs of $2500 per performance. This means that the total cost of x sold out performances would be
2500x + 30000
A sold-out performance brings you $3125. This means that he total revenue from x sold out performances would be
3125x
To break even, cost = revenue
Therefore,
2500x + 30000 = 3125x
3125x - 2500x = 30000
625x = 30000
x = 30000/625
x = 48
Answer:
<em>Most likely time, </em>according to PERT (Program evaluation and review technique).
Step-by-step explanation:
PERT is "a statistical tool used in <em>project management" (Program evaluation and review technique (2020), </em>in Wikipedia), and it is commonly used with CPM <em>(Critical Path Method)</em> to manage projects.
Inside PERT, there are different defined times to accomplished an activity in a project, that is:
- An <em>optimistic time</em> or minimum time required to accomplished an activity, i.e., if everything goes better than normal, the activity is accomplished before expected.
- A <em>pessimistic time, </em>a time quite the opposite to optimistic time.
- A <em>most likely time</em>, or a time required to accomplished an activity if everything goes as expected or normally.
- An <em>expected time</em>, an statistical estimation.
Considering the question, we have that the <em>time</em> when "the first module of the project could be completed":
- "[...] in as few as 15 days" is the <em>optimistic time</em>.
- "[...] or could take as many as 25 days" is the <em>pessimistic time</em>.
- "[...] but most likely will require 20 days" is the <em>most likely time</em>.
As a result, the <em>20-day estimate</em> is called the <em>most likely time</em> in the context of the PERT/CPM techniques.
Answer: ∠DOB: 48°
Step-by-step explanation:
1. we need an equation first. the sum of all angles (108°, n°, 2n°) is equal to 180°. we can depict this with the equation: 108°+2n°+n°=180°
2. now we can solve for the missing variable, n.
108°+3n°=180° → subtract both sides by → 3n°=72° → divide both sides by 3 → n=24°
3. now that we know that n=24°, we can solve the value of ∠DOB. we can see that ∠DOB is 2n° which we just plug the number we got for n into the equation. 2*24=48° meaning ∠DOB is 48°
hope this heped! ♡