Answer:
It would take you 5/3 hours, or 1 hour and 40 minutes.
Hope I helped! ☺
P = 2(L) +2(W)
P = 2(4x+3) + 2(2x)
answer
B. 2(4x+3) + 2(2x)
Answer:
2 5/9 is less than 21/3; 2 5/9 < 21/3
Step-by-step explanation:
<u>Step 1: Convert 2 5/9 into an improper fraction</u>
2 5/9 = 2 * 9/9 + 5/9 = 18/9 + 5/9 = 23/9
<u>Step 2: Convert 21/3 so the denominator is 9</u>
21*3 / 3*3 = 63/9
<u>Step 3: Compare</u>
<em>23/9 < 63/9</em>
<em />
Answer: 2 5/9 is less than 21/3; 2 5/9 < 21/3
Answer:
d. 15
Step-by-step explanation:
Putting the values in the shift 2 function
X1 + X2 ≥ 15
where x1= 13, and x2=2
13+12≥ 15
15≥ 15
At least 15 workers must be assigned to the shift 2.
The LP model questions require that the constraints are satisfied.
The constraint for the shift 2 is that the number of workers must be equal or greater than 15
This can be solved using other constraint functions e.g
Putting X4= 0 in
X1 + X4 ≥ 12
gives
X1 ≥ 12
Now Putting the value X1 ≥ 12 in shift 2 constraint
X1 + X2 ≥ 15
12+ 2≥ 15
14 ≥ 15
this does not satisfy the condition so this is wrong.
Now from
X2 + X3 ≥ 16
Putting X3= 14
X2 + 14 ≥ 16
gives
X2 ≥ 2
Putting these in the shift 2
X1 + X2 ≥ 15
13+2 ≥ 15
15 ≥ 15
Which gives the same result as above.