Step-by-step explanation:
x+5y×4+x×3y+4
5xy×4x+3xy+4
27xy^2
The equation of the plane that goes through these points is:
6x + 2y + z = 10.
<h3>How to find the equation of a plane given three points?</h3>
The equation of the plane is found replacing the points into the following equation:
ax + by + c = z.
For point A, we have that:
3b + c = 4.
For point B, we have that:
a + 2b + c = 0.
For point C, we have that:
-a + 6b + c = 4.
Hence the system is:
From the first equation, we have that:
c = 4 - 3b.
Replacing in the second, we have that:
a + 2b + 4 - 3b = 0
a - b = -4.
Replacing in the third, we have that:
-a + 6b + 4 - 3b = 4.
-a + 3b = 0.
a = 3b.
We have that a - b = -4, hence:
3b - b = -4
2b = -4
b = -2.
a = 3b, hence a = -6.
c = 4 - 3b -> c = 10.
Hence the equation is:
ax + by + c = z.
z = -6x - 2y + 10
6x + 2y + z = 10.
More can be learned about the equation of a plane at brainly.com/question/13854649
#SPJ1
Answer:
Step-by-step explanation:
On a grid,
go to the middle, aka 0,0
move left 4 times, but stay on the same line. Then draw that line up and down on the -4 of x.
sorry if this isn't clear
Answer:
a) The mean is 
b) The standard deviation is 
Step-by-step explanation:
Normal Probability Distribution:
Problems of normal distributions can be solved using the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
The probability a student selected at random takes at least 55.50 minutes to complete the examination equals 0.6915.
This means that when X = 55.5, Z has a pvalue of 1 - 0.6915 = 0.3085. This means that when 
So




The probability a student selected at random takes no more than 71.52 minutes to complete the examination equals 0.8997.
This means that when X = 71.52, Z has a pvalue of 0.8997. This means that when 
So




Since we also have that 





Question
The mean is 
The standard deviation is 