Answer: B
Step-by-step explanation:
Intersection of the 2 parts of the function is (0,0):
==> not A
the second part of the function is an half-line (and x =0)
Answer B
Answer:x=16
Step-by-step explanation:
4x+45=3x+61
Collect like terms
4x-3x=61-45
x=16
The dog snored nine times. 1/3 of an hour is every 30 minute interval. 30 min + 30 min = 1 hour. Multiply this x3, and the answer is nine. A simpler way of thinking about this is 3 x 3 or 3 squared.
Answer:
P(X < 80) = 0.89435.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean and standard deviation , the zscore of a measure X is given by:
The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:
P(X < 80)
This is the pvalue of Z when X = 80. So
has a pvalue of 0.89435.
So
P(X < 80) = 0.89435.
Answer: how do we have the same question need the answer too
Step-by-step explanation: