1answer.
Ask question
Login Signup
Ask question
All categories
  • English
  • Mathematics
  • Social Studies
  • Business
  • History
  • Health
  • Geography
  • Biology
  • Physics
  • Chemistry
  • Computers and Technology
  • Arts
  • World Languages
  • Spanish
  • French
  • German
  • Advanced Placement (AP)
  • SAT
  • Medicine
  • Law
  • Engineering
Irina18 [472]
3 years ago
7

Complete the table below. х y=x2 y = 2 0 0 1 1 2

Mathematics
1 answer:
katovenus [111]3 years ago
5 0
Basically, just replace the x for the expressions.

You might be interested in
Aint its good to have someone to love I swear its the best feeling of my life and shes freaky to i call her mamas and yes im bis
Mamont248 [21]

Answer:

yes

Step-by-step explanation:

why not purr bro I wish I had some one to love on

8 0
3 years ago
Read 2 more answers
(tap the picture in order to see the hole thing) guys i really need help plz its so annoying that i cant answer it
vlabodo [156]
David's total income is ($8/hr)x + ($11/hr)y.

This problem requires us to write and solve an inequality:

8x + 11(15)<$200

Solving for x:     8x < $200-$165, or 8x < $35.  Strictly speaking, x = 4.375 hrs, but if we assume that David must work an integer # of hours, then x=5 full hours.
6 0
3 years ago
ANOVA is a hypothesis testing technique used to compare the equality of means for two or more groups; for example, it can be use
Elza [17]

Answer:

The answer is below

Step-by-step explanation:

ANOVA can be used in a construction industry whereby the construction or project manager is saddled with the responsibility of picking the most appropriate method of construction or materials to be used during construction in the face of two or more alternative options.

For example in terms of method of construction, two or three methods of construction may be available to pick from to construct a building project.

However, due to the possibility of differences in construction cost, and project duration. The construction manager may need to use an ANOVA test to determine the project duration of each method and if it is later revealed through the test that all the methods of construction will lead to the project being delivered on time as the client scheduled.

Then, the construction manager may then result to pick the least expensive alternative of the construction methods.

6 0
3 years ago
If it took 7 hours to mow 4 lawns at a constant rate, how many lawns could be mowed in 35 hours?​
Sidana [21]

8.75 lawns could me mowed in that time

4 0
4 years ago
Read 2 more answers
During a review game, Mr. TooMuch's class correctly answered 68 questions on the first try. If there were 74 questions in the ga
anygoal [31]
I'm not sure but maybe the answer is :
68 / 74 = 0.919
3 0
3 years ago
Other questions:
  • Help help help help help
    14·1 answer
  • I need to simplify sec^2(x)/sec^2(x)-1
    7·1 answer
  • Tickets for a school play cost $7 and $10 for the adults. The equation 7x+10y=80 represents the number of students(x) and the nu
    14·1 answer
  • Simplify the expression:<br> 6(20 + 1)<br> =
    8·1 answer
  • Which ordered pair could be removed to make this relation a function?
    15·2 answers
  • Can someone helpppppppppppp
    12·2 answers
  • Can someone pls pls pls help me with this ?
    6·2 answers
  • Find the mitsake:<br> 1 2 3 4 5 6 7 8 9 10
    9·1 answer
  • Which one is greater <br> 0.09 or 0.091
    5·1 answer
  • I need help with this algebra 2
    5·1 answer
Add answer
Login
Not registered? Fast signup
Signup
Login Signup
Ask question!