Answer:
She ends up at five points after the three turns.
Step-by-step explanation:
4-6= -2
-2+8= 6
6-1= 5
He ends up with 5 points so she does not get the extra 10 points.
Answer:
Length of a Road
Step-by-step explanation: No man that has ever lived (Well unless they're a nephilim or smth) is over a mile tall. Swimming pools and buildings aren't usually big enough to be measured in miles unless they're either a skyscraper or a Wisconsin water park attraction.
Answer: Hello your question is incomplete below is the missing part of the question
The Bureau of the Census reports that the median family income for all families in the United
States during the year 2003 was $43,318. That is, half of all American families had incomes exceeding this amount, and half had incomes equal to or below this amount. Suppose that four families are surveyed and that each one reveals whether its income exceeded $43,318 in 2003.
answer :
P(A) = 11 / 16
P(B) = 3/8
and P(C) = 1/4
Step-by-step explanation:
Making use of the given interpretation for the median we can assign probabilities to simple events as
P(A) = | A | / | sample space |
where | A | = 11
sample space = 16
P(A) = 11 / 16
∴ P(B) = 6/16 = 3/8
and P(C) = 4/16 = 1/4
Answer:
It is the experimental condition.
Step-by-step explanation:
In the experiment given in the question, the amount of sleep is the independent variable and the number of photographs they remember is the dependent variable because it depends on the amount of sleep.
The 8 hours of sleep, which creates the difference in the experiment between the control group and the test group, is the experimental condition.
The experimental condition is the variable that is changed to let the researcher observe the effects on the dependent variable.
I hope this answer helps.
Answer:
(a) 2min/15units
(b) 1min/20units
(c) The bottleneck stage is cutting. The process capacity is 450units/hour
(d) The capacity of the new employee should be 1unit/2sec. The process capacity will increase four times
Step-by-step explanation:
(a) Cycle time for stage cutting for 2 employees = 16sec/2units × 1min/60sec = 2min/15units
(b) Cycle time for stage sealing for 1 employee = 3sec/1unit × 1min/60sec = 1min/20units
(c) Process capacity of stage cutting = 15units/2min × 60min/1hour = 450units/hour
(d) If the capacity of the new employee is 1unit/2sec, the process capacity = 1unit/2sec × 3600sec/1hour = 1800units/hour. The process capacity increases 4 times (1800/450 = 4)