Answer:
y⁷/x⁵ , I hope this helps
Answer:
Time = distance/speed. T = 1,200,000,000/28,000. This can be cancelled to 1,200,000/28. Rounding 28 to 30 for the estimate, divide by another ten: 120,000. Then divide by the remaining 3 from 30: 120,000/3 = 40,000. It will take approximately 40,000 hours.
<em>Hope This Helps!</em>
Answer: 3.2 i think
Step-by-step explanation:
Answer:
<u>They are perpendicular</u>
Step-by-step explanation:
Perpendicular lines have slopes that are negated versions of the other or positive versions of the slope of the other. The slopes are also flipped.
Parallel lines have the same slope.
Neither is when the lines do not follow either of these definitions.
The slope of your two lines are -3/2 and 2/3. These slopes are flipped and the opposite negations of each other. <u>This means the lines are perpendicular.</u>
<u />
Answer:
(2x² + 5x + 2) = (2x + 1)(x +2)
Step-by-step explanation:
Given expression is (2x² + 5x + 2).
We have to factorize the given expression.
(2x²+ 5x + 2) = 2x² + 4x + x + 2
= 2x(x + 2) + 1(x + 2)
= (2x + 1)(x + 2)
So the factored form of the given expression will be (2x + 1)(x + 2).