Answer:
-43
Step-by-step explanation:
first we need to do 9x witch would be 9x3 so 9x3 is 27 now its down to -16 - 27 and that is -43
Each time x increases by 2 (eg: from x = -3 to x = -1), the value of y increases by 7 (eg: y = 9.5 to y = 16.5)
Change in y = 7
change in x = 2
Slope = (change in y)/(change in x) = 7/2 = 3.5
This all means that we have a linear equation
Answer:
P(X < 80) = 0.89435.
Step-by-step explanation:
When the distribution is normal, we use the z-score formula.
In a set with mean
and standard deviation
, the zscore of a measure X is given by:

The Z-score measures how many standard deviations the measure is from the mean. After finding the Z-score, we look at the z-score table and find the p-value associated with this z-score. This p-value is the probability that the value of the measure is smaller than X, that is, the percentile of X. Subtracting 1 by the pvalue, we get the probability that the value of the measure is greater than X.
In this question, we have that:

P(X < 80)
This is the pvalue of Z when X = 80. So



has a pvalue of 0.89435.
So
P(X < 80) = 0.89435.
The simplified form would be -4×^2-13x+9
Answer:
nobody can work 830 in one week; there are only 168 hours in a week
Step-by-step explanation: