Answer:
True
Explanation:
The while loop is going to be executed until the condition is false.
Since <em>k</em> is initially equal to 1, the loop will execute 88 times. One asterisk will be printed and <em>k</em> will be incremented by one during each iteration.
When <em>k</em> becomes 89, the condition will be false (89 is not smaller or equal to 88) and the loop will stop.
Answer:
Option A is the correct answer choice for the above question.
Explanation:
The computer system needs intercommunication which is done inside the processor to process the task given by the user. There are two types of model is used for intercommunication--
- Message passing and
- Shared memory
The difference between two is that message passing passes the message on two points at a single unit of time whereas shared memory simultaneous shares the multiple messages. That's why shared memory is faster than message passing.
- Hence option A is the correct choice because it also refers to the above concept. While the other is not correct because--
- Option B states that message passing is faster than shared memory which is wrong.
- Option C states that message passing is used for large data but shared memory is used for large data.
- Option D states that shared memory is unavailable in some processor which is wrong.
Answer:
22,332
Explanation:
The taxable income :
Line 8 = Standard deduction or itemized deduction
Line 9 = Qualified business income deduction
Line 7 = Adjusted gross income
Taxable income = Adjusted gross income - (Qualified business income deduction + standard deduction)
Taxable income = 34732 - (12400 + 0)
Taxable income = 34732 - 12400
Taxable income = 22,332
Microscope - 1
Telescope - 2
Ruler - 3
Streak plate - 4
Project Management overview or an An activity list is the overall work in a project, including, a list of everything that will be delivered to the client.
<h3 /><h3>What is an activity list?</h3>
An activity list is known to be a kind of document that is made up of all the scheduled activities that are said to be down in a project.
Note that all activity includes one or a lot of tasks that, once completed and others.
Since option is not given, answer will be subjective. Project Management overview or an An activity list is the overall work in a project, including, a list of everything that will be delivered to the client.
Learn more about project from
brainly.com/question/25009327
#SPJ1