Changing the configuration of a database falls under which category of databaseâ administration?
d. operation
Answer: MDM softwares
Explanation:
Here MDM refers to mobile device management software which provides people with the facilities of updating, installing creating backup of various mobile devices within an organisation. Moreover these software's provides tools for proper monitoring and to report their usage across various independent mobile device users. MDM is often used or interconnected with the term BYOD(Bring your own device), whereby employees of an organisation bring their own mobile devices and they are being managed by a MDM software centrally.
Answer: Memory hierarchy is the hierarchy that is created on the basis of the response time of different memories. The performance obtained by the memory helps in creating a computer storage space in distinguished form. The factors considered for the creating of the hierarchy structure are usually response time, storage capacity, complexity etc.
Usage of different kind of memories take place due to different kind of requirements from the system which cannot be fulfilled using one memory device.The requirement is based on saving time, decreasing complexity , improving performance etc.Example of requirements can be like some functions and files do not require much space , some might require quick accessing,etc.
Thus hierarchy of any particular system is in the form of fast to slow order from registers,cache memory, Random access memory(RAM) and secondary memory.
Explanation:
A.)
we have two machines M1 and M2
cpi stands for clocks per instruction.
to get cpi for machine 1:
= we multiply frequencies with their corresponding M1 cycles and add everything up
50/100 x 1 = 0.5
20/100 x 2 = 0.4
30/100 x 3 = 0.9
CPI for M1 = 0.5 + 0.4 + 0.9 = 1.8
We find CPI for machine 2
we use the same formula we used for 1 above
50/100 x 2 = 1
20/100 x 3 = 0.6
30/100 x 4 = 1.2
CPI for m2 = 1 + 0.6 + 1.2 = 2.8
B.)
CPU execution time for m1 and m2
this is calculated by using the formula;
I * CPI/clock cycle time
execution time for A:
= I * 1.8/60X10⁶
= I x 30 nsec
execution time b:
I x 2.8/80x10⁶
= I x 35 nsec
Answer:
B and C
Explanation:
B. Create a method that load valid account records from a static resource, then call this method within test method
C. Create a method that creates valid records, then call this method within test methods