Answer:
The problem is the team leader thinks he/she is better than other team members?
Explanation:
He/She thinks or to show that no other team leader is as good as him/her.
Pretty sure answer is <span>E-mail spam</span>
Answer:
(10^6 + 9.9)
Explanation:
Given:
Total number of machine instructions = 1000
Number of page fault in 100 instructions = 1
Number of page faults in 1000 instructions = 10
Time to serve one page fault = 100 milliseconds
Time to serve ten page faults = 100*10 milliseconds = 1000 milliseconds = 10^6 Microseconds
Number of instructions without any page fault = 1000 - 10 = 990
Time required to run 1000 instructions = 10 Microseconds
So, time required to run 990 instructions = (10*(990/1000)) Microseconds = 9.9 Microseconds
So, the total time required to run the program = (10^6 + 9.9) Microseconds
<span>What can give working people information about their fields, including conferences and leadership opportunities in those fields?
C: a professional organization </span>