Gio should for sure devide everything by ^2 and then combine like terms.
Answer:
C. 3.33 hours
Step-by-step explanation:
Use the algebra work equation:
=
+
, where tb is the time to work together, t1 is the time it takes one person, and t2 is the time it takes the other person
Plug in the values we know:
=
+ 
=
+ 
= 
20 = 6tb
3.33 = tb
So, it would take them 3.33 hours when working together.
In this item, we are tasked to determine the calculation that can be done in order to determine the length or width of the painted mural in each striped area. This can be done by dividing the total length by the number of stripes as shown in the equation below.
Length per stripe = Total length / number of stripes
Length per stripe = 15 yards / 96 stripes
= 0.15625 yard/stripe