5x-8y=1...(1)
3x+6y=-21...(2)
(1)*3:
15x-24y=3...(3)
(2)*5:
15x+30y=-105...(2)
(3)-(2):
15x-24y-(15x+30y)=3-(-105)
15x-24y-15x-30y=108
-54y=108
y=-2
Answer:
y=0x+-6
Step-by-step explanation:
y=mx+b
Let's say "m" is the manufactoring cost per drill (in dollars).
Then the manufactorer sells it for $4 more, so this would be:
m+4
Then the chain store sells it for 140% of the price is paid the manufactorer, so this would be "140% of (m+4)" which translates to "1.4•(m+4)" or more simply:
1.4(m+4)
P(m) = 1.4(m+4), where m is the initial manufactoring cost (in dollars).
Simplifying, you could rewrite this as:
P(m) = 1.4m + 5.6
Answer:
A.
Step-by-step explanation:
for (10,5)
5 - 5 = 2(10 - 10) = 0
for (4,-7)
-7 - 5 = 2(4 - 10) = -12
Answer:
<u></u>
Explanation:
The text and the model are garbled.
This is the question amended:
<em />
<em>Hyun Woo is riding a ferris wheel. H(t) models his height (in m) above the ground, t seconds after the ride starts. Here, t is entered in radians.</em>
<em>H(t) = -10 cos(2π/150 t)+10</em>
<em />
<em>When does Hyun Woo first reach a height of 16 m?</em>
<em />
<h2>Solution</h2>
<em />
When <em>Hyun Woo reaches a height of 16 m</em> the <em>model </em>states:
- <em>16 = -10 cos(2π/150 t)+10</em>
<em />
Then you must find the lowest positive value of t that is a solution of the equation.
Solve the equation:
- <em>16 = -10 cos(2π/150 t)+10</em>
- t = 52.86s ≈ 53 s ← answer